@@ -417,7 +417,7 @@ What are possible benefits from practicing Test Driven Development (TDD)?
417417_ [ ⬆ Back to Top] ( #table-of-contents ) _
418418
41941913 . ### Question13
420- Who decides the system architecture of a Product developed using Scrum?
420+ Who decides the System Architecture of a Product developed using Scrum?
421421
422422- [ ] The Architect chosen by the Scrum Team.
423423- [ ] The Software Architect assigned to the Scrum Team.
@@ -1411,10 +1411,10 @@ _[⬆ Back to Top](#table-of-contents)_
14111411108 . ### Question108
14121412What happens during Sprint 0? (choose the best answer)
14131413
1414- - [ ] Establish base system architecture and design, install version control and continuous integration setup.
1414+ - [ ] Establish base System Architecture and design, install version control and continuous integration setup.
14151415- [x] There is no such thing as Sprint 0.
1416- - [ ] Base system architecture and design.
1417- - [ ] Overall planning, base system architecture , base design, version control and continuous integration setup.
1416+ - [ ] Base System Architecture and design.
1417+ - [ ] Overall planning, base System Architecture , base design, version control and continuous integration setup.
14181418- [ ] Requirements gathering, version control setup, and continuous integration setup.
14191419
14201420_ [ ⬆ Back to Top] ( #table-of-contents ) _
@@ -1430,7 +1430,7 @@ Product Backlog items are refined by: (choose the best answer)
14301430_ [ ⬆ Back to Top] ( #table-of-contents ) _
14311431
14321432110 . ### Question110
1433- Who is responsible for the system architecture of a Product being developed using Scrum? (choose the best answer)
1433+ Who is responsible for the System Architecture of a Product being developed using Scrum? (choose the best answer)
14341434
14351435- [ ] The Architect chosen by the Scrum Team.
14361436- [x] The Developers.
@@ -2958,7 +2958,7 @@ When does the Development Team participate in Product Backlog Refinement?
29582958_ [ ⬆ Back to Top] ( #table-of-contents ) _
29592959
29602960264 . ### Question264
2961- When is a system 's architecture decided?
2961+ When is a System 's Architecture decided?
29622962
29632963- [ ] In the beginning of the project, during Sprint 0.
29642964- [ ] It is designed along with the vision, before the first Sprint.
@@ -3092,7 +3092,7 @@ While changing Software, you find a bug in a previously delivered piece of funct
30923092_ [ ⬆ Back to Top] ( #table-of-contents ) _
30933093
30943094277 . ### Question277
3095- Who is responsible for the system architecture of a Product being developed using Scrum?
3095+ Who is responsible for the System Architecture of a Product being developed using Scrum?
30963096
30973097- [ ] The Architect chosen by the Development Team.
30983098- [ ] The Corporate Architect.
0 commit comments