Skip to content

Commit 75da07b

Browse files
Update docs/cdk/how-to/migrate/7-8.md
1 parent 372a5d7 commit 75da07b

File tree

1 file changed

+0
-18
lines changed

1 file changed

+0
-18
lines changed

docs/cdk/how-to/migrate/7-8.md

Lines changed: 0 additions & 18 deletions
Original file line numberDiff line numberDiff line change
@@ -5,24 +5,6 @@ This document shows Polygon partners how to migrate a CDK stack from fork 7 to f
55

66
## Process to upgrade from fork 7 to 8 for isolated CDK chains
77

8-
1. CDK owners make an upgrade request to Polygon.
9-
10-
2. Polygon schedules the update transaction, and informs the owners of the date and time that the timelock delay expires, after which point the upgrade can go ahead.
11-
12-
3. Polygon and CDK owners agree upon a time window for the upgrade.
13-
14-
4. During the agreed time window, CDK operators ensure that all the batches of the system are verified. Follow the [verify all batches](#verify-all-batches) instructions below to do that.
15-
16-
!!! warning
17-
The current batch verification procedure relies on stopping the sequencer.
18-
19-
5. After successful batch verification, CDK operators inform Polygon that their CDK is ready for the upgrade.
20-
21-
6. Polygon executes the scheduled transaction on the timelock, making the upgrade effective.
22-
23-
7. Polygon informs the CDK operators of the transaction confirmation. (It is also possible to check Etherscan for confirmation of the same.)
24-
25-
8. CDK operators update the software and restart all components. Follow the [update software](#update-software) instructions below.
268
In order to avoid reorgs and other undesirable scenarios, all L2 transactions must be verified before upgrading a fork. Verification means that all batches are closed, sequenced, and verified on L1.
279

2810
Follow the steps to verify all batches for upgrading from fork 7 to 8.

0 commit comments

Comments
 (0)