Skip to content

Commit 83e0e50

Browse files
authored
Update forkid-9-12.md
pls merge
1 parent cf0f848 commit 83e0e50

File tree

1 file changed

+3
-4
lines changed

1 file changed

+3
-4
lines changed

docs/cdk/how-to/migrate/forkid-9-12.md

Lines changed: 3 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -114,7 +114,9 @@ go run ./zk/debug_tools/datastream-host \
114114
**Please Note:** To avoid creating reorgs or other unwanted situations, it's important that all L2 transactions are verified before performing a fork upgrade. This means all batches should be closed, sequenced, and verified on L1.
115115

116116
### Steps to Halt the Sequencer
117-
117+
> 💡 Please note: For an isolated chain not attached to the Agglayer the chain admin can perform operational step 4 on their chain’s rollupmanagercontract.
118+
Polygon are not involved. Please check the [upgrade procedure for isolated networks](#contract-upgrade-procedure-for-isolated-networks).
119+
>
118120
1. Stop the sequencer.
119121
2. Reconfigure the node to enforce sequencer stops at a specific `batch_num`:
120122
- Get the current batch number from StateDB:
@@ -159,9 +161,6 @@ go run ./zk/debug_tools/datastream-host \
159161

160162
3. Stop all services (node, prover/executor, bridge).
161163

162-
> 💡 Please note: For an isolated chain not attached to the Agglayer the chain admin can perform operational step 4 on their chain’s rollupmanagercontract.
163-
Polygon are not involved. Please check the [upgrade procedure for isolated networks](#contract-upgrade-procedure-for-isolated-networks).
164-
165164
4. **Polygon:** Upgrade the Smart Contract (multisig):
166165
- Upgrade rollup to fork 12.
167166
- Wait for the Tx to be finalized.

0 commit comments

Comments
 (0)