Skip to content

Merge pull request #720 from tnull/2025-11-fix-check-closed-event #2420

Merge pull request #720 from tnull/2025-11-fix-check-closed-event

Merge pull request #720 from tnull/2025-11-fix-check-closed-event #2420

Triggered via push November 26, 2025 09:48
Status Cancelled
Total duration 30s
Artifacts

rust.yml

on: push
Documentation
16s
Documentation
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

21 errors
build (ubuntu-latest, 1.85.0)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (ubuntu-latest, 1.85.0)
The operation was canceled.
Documentation
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
Documentation
The operation was canceled.
build (macos-latest, 1.85.0)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (macos-latest, 1.85.0)
The operation was canceled.
build (windows-latest, 1.85.0)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (windows-latest, beta)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (windows-latest, 1.85.0)
The operation was canceled.
build (windows-latest, beta)
The operation was canceled.
build (macos-latest, beta)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (macos-latest, beta)
The operation was canceled.
build (macos-latest, stable)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (macos-latest, stable)
The operation was canceled.
build (windows-latest, stable)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (windows-latest, stable)
The operation was canceled.
build (ubuntu-latest, beta)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (ubuntu-latest, beta)
The operation was canceled.
build (ubuntu-latest, stable)
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists
build (ubuntu-latest, stable)
The operation was canceled.
CI Checks - Rust Tests
Canceling since a higher priority waiting request for CI Checks - Rust Tests-refs/heads/main exists