Skip to content

chore: Prepare release 1.16.8 #506

chore: Prepare release 1.16.8

chore: Prepare release 1.16.8 #506

Triggered via push March 24, 2025 11:24
Status Failure
Total duration 1m 34s
Artifacts 1

ci.yml

on: push
quality
49s
quality
exclude-test-jobs
3s
exclude-test-jobs
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (ubuntu-latest, 3.9, lowest-direct)
Process completed with exit code 2.
tests (ubuntu-latest, 3.9, highest)
The operation was canceled.
tests (ubuntu-latest, 3.9, highest)
The strategy configuration was canceled because "tests.ubuntu-latest_3_9_lowest-" failed
tests (ubuntu-latest, 3.10, highest)
The operation was canceled.
tests (ubuntu-latest, 3.10, highest)
The strategy configuration was canceled because "tests.ubuntu-latest_3_9_lowest-" failed
tests (ubuntu-latest, 3.10, lowest-direct)
The operation was canceled.
tests (ubuntu-latest, 3.10, lowest-direct)
The strategy configuration was canceled because "tests.ubuntu-latest_3_9_lowest-" failed

Artifacts

Produced during runtime
Name Size Digest
objects.inv Expired
5.26 KB
sha256:3c77e9dc6ea4179dcdf4d90a57400112705375ef0525833b8e83ff1acc85da9c