Skip to content

chore: add prism file #1219

chore: add prism file

chore: add prism file #1219

Triggered via pull request September 11, 2025 06:39
Status Failure
Total duration 47s
Artifacts

test-and-deploy.yml

on: pull_request
Matrix: Test
Deploy
Deploy
Slack notify on failure
Slack notify on failure
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Test (3.11)
Process completed with exit code 2.
Test (3.9)
Process completed with exit code 2.
Test (3.9)
The strategy configuration was canceled because "test._3_11" failed
Test (3.10)
Process completed with exit code 2.
Test (3.10)
The strategy configuration was canceled because "test._3_11" failed
Test (3.12)
The operation was canceled.
Test (3.12)
The strategy configuration was canceled because "test._3_11" failed
Test (3.13)
The operation was canceled.
Test (3.13)
The strategy configuration was canceled because "test._3_11" failed