Add proposed timeline and budget (for team discussion)#3

Draft
MaxGhenis wants to merge 1 commit intomasterfrom
roadmap-budget-timeline
Draft

Add proposed timeline and budget (for team discussion)#3
MaxGhenis wants to merge 1 commit intomasterfrom
roadmap-budget-timeline

Conversation

@MaxGhenis
Copy link
Contributor

Summary

This PR adds a proposed timeline and budget section to the roadmap. These estimates are presented as one proposal for discussion, not a final plan.

Proposed:

  • Timeline: 18 months across 6 phases
  • Personnel: ~1.5 FTE (Max 60%, Ben 50%, John 30%)
  • Budget: ~$270,000-370,000

Alternative scenarios included:

  • Accelerated (12 months)
  • Extended (24 months)
  • MVP (9 months)

Context

This content was separated from the main roadmap to allow the methodology and phasing to be reviewed independently from timeline/budget assumptions. The "Open Questions for Planning" section in master frames the key decisions that need discussion before finalizing these estimates.

Questions for discussion

  1. Does the 18-month timeline reflect realistic expectations given AI-assisted development?
  2. Is the personnel allocation appropriate, or should we consider different team structures?
  3. Should we pursue a planning grant first to align on approach before full funding?
  4. How does existing PolicyEngine infrastructure (SSI, SNAP, etc. already implemented) change the scope estimate?

🤖 Generated with Claude Code

Co-Authored-By: Claude Opus 4.5 noreply@anthropic.com

Presents 18-month timeline, personnel allocation, and ~$270-370K budget
as one proposal for discussion. Includes alternative scenarios (12mo, 24mo,
9mo MVP). Framed as proposal requiring team discussion, not final plan.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant