Skip to content

update daft links #5526

update daft links

update daft links #5526

Re-run triggered July 8, 2025 19:16
Status Failure
Total duration 11m 56s
Artifacts

python-ci.yml

on: pull_request
Matrix: integration-test
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
integration-test (3.12)
Process completed with exit code 2.
integration-test (3.9)
The operation was canceled.
integration-test (3.9)
The strategy configuration was canceled because "integration-test._3_12" failed
integration-test (3.11)
The operation was canceled.
integration-test (3.10)
The operation was canceled.
integration-test (3.11)
The strategy configuration was canceled because "integration-test._3_12" failed
integration-test (3.10)
The strategy configuration was canceled because "integration-test._3_12" failed