Bump Ruby dependencies #3333
Merged
Bump Ruby dependencies #3333
Travis CI / Travis CI - Pull Request
cancelled
Dec 21, 2024 in 6h 59m 40s
Build Canceled
The build canceled. This is a change from the previous build, which errored.
Details
This is a pull request build.
It is running a build against the merge commit, after merging #3333 Bump Ruby dependencies.
Any changes that have been made to the main branch before the build ran are also included.
Jobs and Stages
This build has three jobs, running in parallel.
| Job | OS | State |
|---|---|---|
| Linux | canceled | |
| Linux | errored | |
| Linux | errored |
Build Configuration
| Build Option | Setting |
|---|---|
| Language | Ruby |
| Operating System | Linux (Jammy) |
Build Configuration
{
"language": "ruby",
"os": [
"linux"
],
"dist": "jammy",
"before_install": [
"sudo apt update -yq",
"sudo apt -yq install gcc-11",
"gcc-11 --version"
],
"before_script": [
"export MAKEFLAGS=\"V=1 CC=gcc-11\""
],
"notifications": {
"email": [
{
"recipients": [
"jun.aruga@gmail.com"
],
"on_success": "never",
"on_failure": "always"
}
]
},
"jobs": {
"include": [
{
"arch": "arm64"
},
{
"arch": "ppc64le"
},
{
"arch": "s390x"
}
],
"fast_finish": true
}
}
Loading